Sabaki Guide

Lovable Project Evidence Setup In Sabaki

How to connect Lovable project metadata, app URLs, and repository links as Sabaki evidence.

Lovable project evidence sync is the Sabaki workflow for storing Lovable project state, app URLs, and linked repository references as evidence items.

Key Takeaways

How To Sync Lovable Evidence

  1. Collect project detailsPrepare the Lovable project ID, project URL, app URL, and any linked repository records.
  2. Connect Lovable in SabakiOpen Apps, choose Lovable, and save the project configuration.
  3. Run Sync NowSync the connection to store project and repository evidence.
  4. Inspect evidenceUse Advisor or source-backed views to confirm the project state is available.
  5. Update configuration after changesReconnect or update the connection when project URLs or repository links change.

Quick Comparison

Synced ItemSourceSabaki Use
Project stateLovable project ID or URLSource-backed app context
App URLLovable app URLRuntime or product evidence
Repository linksConfigured repositoriesWorkflow handoff and source evidence

Frequently Asked Questions

Does Lovable sync KPIs?

No. Lovable currently syncs evidence items, not KPI snapshots.

What format should I use for the connection?

Use the project configuration accepted by the connection form, including project or app URL and repository details where available.

When should I reconnect Lovable?

Reconnect when the project URL, app URL, or repository links change materially.

How does Advisor use Lovable evidence?

Advisor can use permitted source-backed project evidence when answering product-readiness or company-context questions.

Back to Sabaki